PROJECT DETAILS
We executed this project for a SABIC chemical plant in Al Jubail, Saudi Arabia. The objective of the project is to dilute the concentration of pollutants in the high-rise stack by injecting steam generated from the waste heater boiler. We carried out CFD analysis and analyzed the reduction in the concentration of pollutants. We designed a sparger which enabled us to increase the effective height of the stack.
We Got More
Go through All Our Case Studies